WISPECT LLC® is a Registered UDC Inspection Agency contracted with the State of Wisconsin to administer and enforce Wisconsin’s Uniform Dwelling Code. Since January 1st, 2005 WISPECT® has issued 100’s of Wisconsin Uniform Building Permits and conducted 1000’s of on-site inspections to ensure compliance with the UDC.

Currently WISPECT® provides administration and enforcement of the UDC for municipalities in Ashland and Bayfield Counties. The permitting process begins with submission of a Wisconsin Uniform Building Permit Application and the documentation required to conduct a review of the construction, energy conservation, plumbing, electrical, and HVAC plans to ensure compliance with the UDC.

The following inspections are required:

1) FOOTING

Call for this inspection before cement is poured or posts are backfilled. Forms should be in place in suitable soil with required reinforcing rods, and width and depth should be correct. Drain tile system is required by the Inspection Agency. Drain tile bleeders need to be installed.

2) FOUNDATION

For POURED foundations, call BEFORE cement is poured. For all other types of foundations (block, wood, etc.) call after waterproofing and after drain tile has been installed but before backfilling. For slab on grade foundations all the under-slab installations need to be completed and inspected before concrete is poured.

3) UNDER-SLAB INSPECTION (For concrete basement floors)

All the under-slab installations need to be completed and inspected before concrete is poured

4) ROUGH CONSTRUCTION/FRAMING

Call when basic framing of project is complete.

5) PLUMBING

Your plumber will usually call this in when they are ready with the air test. Waste and vent plumbing must hold 5 PSI of air for 15 minutes.

6) ELECTRICAL SERVICE INSPECTION

This is done after framing but before insulation. All electrical boxes are in place, wire is pulled and stapled, wires in the boxes are stripped and tied and pigtailed as needed. The service must be inspected before the power company will hook up the power.

7) ROUGH HVAC

This is done after framing but before insulation. Most heat register openings and cold air return cavities are in place.

 

8) INSULATION

When items found in the rough-in inspections have passed, then insulation may take place. The inspection of the insulation and vapor barrier are done prior to hanging of drywall.

9) FINAL INSPECTION

This inspection is for occupancy or project completion. A written report is made at this inspection, giving details of violations and a clearance to occupy structure if a new home.

 

WISPECT LLC is a Veteran-Owned Company

Powered by Mortgage Rates
Powered by Mortgage Calculator Mortgage Calculator

First Name:
Last Name:
Email Address:
Permit Number:
Phone:
Schedule an Inspection
  

Schedule a UDC Inspection

Anti-Spam Policy

WISPECT LLC has a zero-tolerance spam policy. We cooperate with state and federal authorities by reporting all illicit use of our website.